Project Specs

Design Fee

$18,200

Design Time

4 weeks each

Construction Duration

3 months each

Project Overview

  • Provided specialized MEP design consulting services for the nationwide renovation of diverse office and retail spaces into fully operational medical facilities for Premise Health, supporting an architectural partner as a dedicated subconsultant. Leopardo Efficiency delivered HVAC, electrical (lighting, power, and data), and plumbing system designs tailored to the unique constraints of each site, ensuring high-quality results delivered on time and within budget.
  • Addressed an unforeseen regulatory requirement related to heating in unoccupied “Back of House” spaces not originally included in the project scope. Upon notification from permitting officials, Leopardo Efficiency engineers coordinated with the contractor to conduct on-site electrical metering and evaluate proposed heating options.
  • Recommendations were finalized and implemented within three business days, ensuring compliance without delaying the construction schedule.
  • Resolved a critical ductwork routing conflict identified during ceiling exposure. The contractor raised concerns regarding feasibility based on site conditions, prompting Leopardo Efficiency’s mechanical team to investigate and propose revised routing strategies. Updated drawings were issued within four business days, maintaining project momentum.
  • Both incidents highlight the value of responsive engineering, real-time site assessments, and agile coordination with contractors and permitting officials. Flexible scoping and collaborative problem-solving enabled Leopardo Efficiency to uphold design integrity and project timelines, even under evolving site conditions.